Interestingly he said the efficiency loss from having panels mounted at the ‘wrong’ angle is essentially nothing particularly when you consider the increased density and reduction in site prep/installation. They can literally install a couple hundred kW in an afternoon
[0] https://5b.co/
This is also why 2-axis and 3-axis tracker mechanisms are rarely seen these days, the cost of foundation/structure to build a thing on a concrete and steel pier that can 'steer' just six 1.65x1.0 meter size panels is extreme. It's like a big sail in wind loading so it takes a lot of steel and structure to resist that.
The website says "shallow ground penetration" which sounds to me like some sort of anchors that are drilled into the surface then bolts run down into them (such as with a construction team using the largest size of battery operated Milwaukee hammer drills?), or similar.
I think it comes in pretty useful at temporary sites and for disaster relief but not sure if it’s been deployed for that yet
https://www.reddit.com/r/Damnthatsinteresting/comments/18p1q...
https://www.naturaecoenergy.com/robotic-solar-panel-cleaning...
How frequently really depends on the local climate, but at least a few times a year even in a place that doesn't have dust storms.
A couple of hundred panels just laid on the ground.
Even strong winds didn't lift them.
But after just a few months they're kinda covered in mud.
[0] https://electrek.co/2022/12/12/texas-solar-farm-flat-on-the-...