[0] https://electrek.co/2022/12/12/texas-solar-farm-flat-on-the-...
Interestingly he said the efficiency loss from having panels mounted at the ‘wrong’ angle is essentially nothing particularly when you consider the increased density and reduction in site prep/installation. They can literally install a couple hundred kW in an afternoon
[0] https://5b.co/
This is also why 2-axis and 3-axis tracker mechanisms are rarely seen these days, the cost of foundation/structure to build a thing on a concrete and steel pier that can 'steer' just six 1.65x1.0 meter size panels is extreme. It's like a big sail in wind loading so it takes a lot of steel and structure to resist that.
The website says "shallow ground penetration" which sounds to me like some sort of anchors that are drilled into the surface then bolts run down into them (such as with a construction team using the largest size of battery operated Milwaukee hammer drills?), or similar.
I think it comes in pretty useful at temporary sites and for disaster relief but not sure if it’s been deployed for that yet
https://www.reddit.com/r/Damnthatsinteresting/comments/18p1q...
https://www.naturaecoenergy.com/robotic-solar-panel-cleaning...
How frequently really depends on the local climate, but at least a few times a year even in a place that doesn't have dust storms.
A couple of hundred panels just laid on the ground.
Even strong winds didn't lift them.
But after just a few months they're kinda covered in mud.
Probably. The fix would be for the panels to be an intrinsic part of the roof, meaning they don't have to be separately installed.
With the cost of big-ass 400W solar panels as low as they are now, in the pallet load or container load, much of the cost is actually the labor and the mounting.
$150 per panel x 22 on a pallet = $3300
For a ground mounted PV system, you can easily spend far more than 3300 on the foundation work, concrete, steel erection and frame than the raw solar panel costs now. Randomly chosen 40kW theoretical would be $15000 in panels plus LTL truck cargo, the rest of the costs for a working system would be much more than 15k.
It's also possible for a roof mounting system to cost more than the panels in materials and labor and time.