They complain about arrogance, but even if you accept that, it was arrogance BEFORE Gelsinger, with Intel under the control of MBAs that they're talking about.
And can I just say, I've seen some seriously arrogant assholes in the tech departments I've worked ... but for absolute incredible arrogance, you need MBAs.
The leadership (not technical) are disconnected from reality.
Did engineers know there were problems? Of course, they are smart, but the leadership doesn’t listen
Design pipelines are deep and Intel at the time famously had very node-specific designs without industry-standard PDKs. The moment engineers were told to switch a design to 14nm, it basically reset the 5 year design-to-product pipeline. Management failed because they did not hedge the risk by starting a parallel 14nm design effort at first sign of 10nm troubles. They likely were engaged in magical thinking or some variation of the "Are YOU going to tell him?" Silicon Valley scene. It does not help that information like that is considered actionable insider trading information. I bet a lot of people working on 10nm designs first heard the news about the delays from the quarterly investor calls.
Right. It was well-known publicly that Intel was running their business in a way that maximized the damage any fab troubles would have on their product roadmap. It was obvious a decade ago that Intel needed more flexibility to bring their CPU designs to other fab processes. It took them too long to start working on Rocket Lake, and too long to deliver it. But they have at least made some progress on the problem, since they've been selling x86 CPU cores made at TSMC for the past year.
(On a related note: Buying Altera and forcing them to port their entire roadmap over to a broken 10nm process was made even more stupid by the fact that Intel didn't have a usable PDK that outsiders and acquisitions could work with.)
Meanwhile, Intel's chip designers kept targeting an unusable process, and wasted years that they should have been iterating on designs for the fab process that actually worked. Skylake shipped in 2015. They didn't deliver a new CPU microarchitecture on 14nm until 5.5 years later, a year and a half after they shipped that same microarchitecture in a mobile-only form when their 10nm finally started to be somewhat usable (but not fast enough for desktop).
What were the chip designers doing for all those years? In 2015, Intel knew that 14nm had been harder to bring up than any previous fab process, and they knew that 10nm was proving even harder, but they refused to try making an updated CPU design for 14nm. How could the management not have realized that spending multiple consecutive years not shipping new designs would cause long-term damage to their capability to iterate on CPU designs? Not participating in the feedback loop of actually shipping left Intel with an oversized P-core design and an E-core design that wasn't well-matched to it, making Alder Lake awkward and slapdash when they finally got 10nm working well enough for desktop CPUs.