Re:Work begins on a $12B high-speed rail line between Las Ve...
by ldng on Wednesday April 24, 2024 @05:28AM
(#40142276)
In France, it depends a lot on the lines : Paris-Lyon has average of 270 km/h (167 mph); Paris-Bordeaux clock at around 300 km/h (186 mph) while Paris-Brest is more at 200 (124 mph).
It is interesting to note that it often seems ti correlate to the age of the line, with Paris-Bordeaux being the most recent.
Re:Work begins on a $12B high-speed rail line between Las Ve...
by fransje26 on Wednesday April 24, 2024 @07:42AM
(#40143150)
Yes, but they are limited by the technology used to build the line, and by how the lines were traced, but not because their high-speed trains need to stop at every city center or run on "winding" tracks, as is the case in Germany.
The Paris-Lyon line is by far the oldest, and is top-speed limited because of how it was traced. (And also because of its out-dated security system that is in the process of being changed)
The Paris-Brest line stops being a high-speed track in Rennes, so even if the first part is fast, it's still a long way to Brest on conventional tracks.
The newer lines are faster, as they are designed for theoretical operational speeds of 350 km/h, with a current operational top speed of 320. (LGV Sud Europe Atlantique, LGV Rhin-Rhone, LGV Est, and even the LGV Bretagne Pays-de-Loire going to Brest)
Reminds me of high-speed rail in France vs high-speed rail in Germany. To the point that newer Siemens trains will have a lower top-speed, because "there is no demand for it".