Re:Scrum Sucks
by Scubabear68 on Monday January 15, 2024 @12:39PM
(#39003646)
Interesting, I have a very similar story from last year. Existing CTO and head of product acted as if they were writing complex, mission critical software (they weren’t) and instituted processes to match. It went from overly ad hoc to over-the-top scrum. As a result, features took months to develop and everyone was terrified of releases. Teams bloated to massive size.
CTO was fired, I came in and evaluated everything, slashed the consulting teams down to the ones clearly performing, and slashed the processes down to boot. Within a month the team velocity was way up and we were releasing to a nice cadence without fear.
And this was not because I’m a super man. I’m not. Any competent tech lead or manager could have done the same. The only difficult part was dragging the product folks along, they kicked and screamed the whole way, predicting doom, and were amazed when the sky didn’t fall.
Luckily I was in a position to change things and consolidated a lot of the ceremonies. I kept more of the process in place for our offshore partner team because the communication burden was higher.
So I guess my two take aways are that time in meetings needs to be evaluated with how meetings are grouped to avoid too much context switching and allow for folks to get into a flow. The other is that how strictly you adhere to “textbook” scrum really depends on the composition of the team. More junior teams or teams that are insolated from the larger business context benefit more from more process imho.