News for hackers. Stuff that matters.
Re:Panama Canal drought forces Maersk to start using land br... by Scoundreller on Sunday January 14, 2024 @06:03AM (#38989384)
But you do get the opportunity of running multiple smaller ships on the receiving end to different destinations.

That transloading often happens anyway eventually.

And injecting some straight into the local railway network.

And running larger than Panamax ships on either side.

Re:Panama Canal drought forces Maersk to start using land br... by zer00eyz on Sunday January 14, 2024 @07:00AM (#38989651)
> But you do get the opportunity of running multiple smaller ships on the receiving end to different destinations.

But for the Jones act. Ask Puerto Rico, Alaska and Hawaii why everything is so expensive!

https://www.cato.org/blog/jones-acts-role-encouraging-puerto...

Re:Panama Canal drought forces Maersk to start using land br... by gumby on Sunday January 14, 2024 @08:04AM (#38990049)
In this case Mexico is a sovereign country so the Jones Act won’t apply.
Re:Panama Canal drought forces Maersk to start using land br... by bluGill on Sunday January 14, 2024 @08:41AM (#38990273)
One end is Mexico sothe jones act won't apply. In fact this could make thing, cheaper because a small ship, for a short run makes sense
Re:Panama Canal drought forces Maersk to start using land br... by zer00eyz on Sunday January 14, 2024 @11:28AM (#38991820)
40% of all us containers go through the canal.

60% of all canal traffic is US containers.

Look at some place North Carolina... 1000 calls a year. There is rail, truck and warehouse infrastructure to support that. It is highly optimized because of domestic transit by rail and truck, of imports and exports.

If you optimize your profit, by dropping imports closer to the point of consumption any extra profit you make will be consumed by rail and trucks getting exports to you in a non optimal way.

The smart choice is to sail to the port where the exports are. But because you can't take that domestic cargo you going in a non optimal state... that empty transit time just cost you money because you have a 2nd captain, crew, ship, insurance and moving an empty vessel is waste!

Basicity the limits the jones act imposes means that you can't fully optimize against the cost and structure of domestic transit.

Re:Panama Canal drought forces Maersk to start using land br... by bluGill on Sunday January 14, 2024 @01:46PM (#38993163)
The context here is bypassing the canal for a railroad across Mexico. While you have described the problem with the Jones act, the premises is we are loading/unloading in Mexico that changes a lot. Smaller ships can go to many different ports - large ones would probably still got to North Carolina, but we can sort in Mexico which means some (likely small) shipping company can run routes to smaller ports, they can take exports from those smaller ports and then sorting in Mexico can get it on/off the right ships. For US east coast to cargo that is crossing the pacific this makes sense (it doesn't make sense for cargo crossing the Atlantic though, so the Jones act is still a problem)
Re:Panama Canal drought forces Maersk to start using land br... by Scoundreller on Sunday January 14, 2024 @04:38PM (#38994678)
This is effectively what happens with air cargo in Anchorage. It's a nice mid-point between asia and north america. They can receive aircraft cargo from many different sources in asia and then shuffle it between aircraft to ship it to different destinations in north america.

Iceland Airlines kinda does the same shuffle for transatlantic flights and self-loading freight ;)

Re:Panama Canal drought forces Maersk to start using land br... by SilasX on Sunday January 14, 2024 @12:02PM (#38992104)
I remember having the shower thought that you could replace canals with railways by redesigning ships to automatically, rapidly offload containers directly onto some superfast maglev railway, effectively "shooting" the containers to the other side.

But running the numbers on it, you really can't compete on throughput, what with the truly massive capacity of cargo ships. Like, even if it had only 3000 conatiners, it only has to go at 1/1500th of the rail speed (assuming you can stack them two-high) to beat it. This page[1] says panamaxes have traditionally held 5000, with "New Panamax"es carrying 13,000.

(Edit: ChatGPT tells me that transit of the canal takes 10 hours on the high side, and it's 82 km long, so that's an effective ship speed of 8.2 km per hour, meaning the rail would have to go 20,000 km/h to compete on throughput.)

But yeah, the other advantages you mention would apply.

[1] https://en.wikipedia.org/wiki/Panamax?useskin=vector#Cargo_c...

Re:Panama Canal drought forces Maersk to start using land br... by Solvency on Sunday January 14, 2024 @01:09PM (#38992736)
So then why not build a bigger rail system and put the land equivalent of container ships on rails? I'm serious.
Re:Panama Canal drought forces Maersk to start using land br... by AnimalMuppet on Sunday January 14, 2024 @01:20PM (#38992883)
First: When the GP said 13,000 containers, I presume that's TEU (twenty-foot equivalent unit). A double-stack rail car holds 4 TEU. That means that you only (!) need 3,250 cars to replace the ship. That's a really long train.

What's perhaps more reasonable is to replace it with maybe 20 trains. You could maybe run such trains on a 10-minute headway, so 6 trains an hour, so 3 1/3 hours.

That's to replace one ship.

But it's also if you only have a single track rail line. You could build N parallel tracks along the same route. (This is far more reasonable than trying to build something where you can stack the containers 10 high or something, and then wide enough that it would be stable, and then you have to worry about the load-bearing ability of the track.)

But even if you build all those tracks, then you have the problem of unloading the ship at one end, and reloading a different ship at the other end. You can build enough tracks to get any rate you need, but can you get the load/unload speed?

Re:Panama Canal drought forces Maersk to start using land br... by bmicraft on Sunday January 14, 2024 @02:35PM (#38993639)
With a smarter system like ETCS you shouldn't need 10 minutes headway
Re:Panama Canal drought forces Maersk to start using land br... by Solvency on Sunday January 14, 2024 @01:40PM (#38993107)
No I literally mean build a giant wide railroad and make something the size of a container ship, which has the capacity. That's what goes on the rails.

We're talking about Mexico right?

Re:Panama Canal drought forces Maersk to start using land br... by cinntaile on Monday January 15, 2024 @12:33AM (#38997733)
We should probably stick with trains, they can be several km long and it means we don't have to build an entirely new machine with all the new technical challenges that would entail.
Re:Panama Canal drought forces Maersk to start using land br... by SilasX on Monday January 15, 2024 @08:42AM (#39000853)
Thanks for adding detail, but the idea would be to avoid having to group them into a trains at all -- the containers would powered (like a rail gun) and be "shot" straight through the rail system as they're placed on the track.
Re:Panama Canal drought forces Maersk to start using land br... by pvaldes on Monday January 15, 2024 @09:51AM (#39001593)
Seems like it would be a good test for a theoretical "hyperloop" thing, or a maglev. Hyperloop shouldn't be tested first with humans.