Re:The Evolution of Tunnel Boring Machines
by kortilla on Tuesday October 10, 2023 @06:06PM
(#37838278)
You could have added a boring pun to this boring comment.
Re:The Evolution of Tunnel Boring Machines
by ant6n on Tuesday October 10, 2023 @07:24PM
(#37839067)
But that would be boring.
> E.g. during the work on the Eurotunnel. Here the British tunnel boring machine was diverted into the rock near half the length of the tunnel and left there. It was cheaper than somehow taking it out again.
AFAIK it was not just the cost, but the problem of two TBMs (British and French) meeting head to head. The british were driven out of the way so that the French ones could proceed.
Re:The Evolution of Tunnel Boring Machines
by benj111 on Wednesday October 11, 2023 @04:50AM
(#37842270)
I wonder how many political meetings were had, to decide who got out of the way of who.
Or maybe it was the toss of a coin? But then a franc or a pound?
Re:The Evolution of Tunnel Boring Machines
by rurounijones on Tuesday October 10, 2023 @08:42PM
(#37839639)
> E.g. during the work on the Eurotunnel. Here the British tunnel boring machine was diverted into the rock near half the length of the tunnel and left there. It was cheaper than somehow taking it out again.
Dara O`Briain has a hilarious stand-up about this: https://www.youtube.com/watch?v=uFglJ3DyqK0
Re:The Evolution of Tunnel Boring Machines
by pjc50 on Wednesday October 11, 2023 @04:40AM
(#37842223)
Burying TBMs is not uncommon. The HS2 ones are being buried for an indefinite period due to UK government flipflopping. https://www.ianvisits.co.uk/articles/hs2-will-bury-two-tunne...
There's one in New York. https://untappedcities.com/2017/02/09/the-200-ton-tunnel-bor...
He has been working in specialist civil engineering for many years and builds tunnels all over the world. He has told me many exciting and hard-to-believe stories about tunnel construction and tunnel boring machines.
E.g. during the work on the Eurotunnel. Here the British tunnel boring machine was diverted into the rock near half the length of the tunnel and left there. It was cheaper than somehow taking it out again.
Anyways, since my dad is always very stressed due to his job, I am happy to have gained a foothold in IT and not tunnel boring :D