All of the third generation EPR projects being built in Europe have run hugely over budget. I really thought if anyone could build nuclear plants cost effectively it would have been France so it's really made me lose hope in nuclear power.
What nuclear needs is massive subsidies, especially in reactors using small modular designs that are more amenable to mass-manufacturing techniques and transportability, and it needs them sustained for decades until the competitive forces of the large market for SMRs has brought the price of reactors down to levels where they're competitive in the market without subsidies, at which point the growth of privately funded nuclear power would be self-sustaining.
Over the years nuclear has enjoyed enormous subsidies. If it were not for the huge decrease in costs for renewables over the past couple of decades and huge increase in cost for nuclear I’d be much more enthusiastic about nuclear power.
I can’t believe that people are still arguing against nuclear. It’s an extremely proven technology. It can be built fast, cheap and safely.
But at the end of the day real resources matter. Where should labour effort be directed? Costs reflect that effort.
I’m not against nuclear but if redirecting effort (money, labour) from nuclear to renewables and storage seems likely to reduce co2 emissions faster then let’s redirect that effort. It’s fine for cool technologies to be abandoned when cheaper alternatives come along.
If it’s possible to come up with a far cheaper form of nuclear power then great! But it’s hard to compete with the big fusion reactor in the sky.
The subsidies have also not been directed at the SMR market, which is the only one that has the potential to see exponentially declining costs like what's seen in wind/solar.
If we built exactly the same design tens to the low hundreds of times by the same handful of teams, the cost per unit would be dramatically lower. This is especially true of the modern, safer, and more cost effective designs.