Re:Optimizing Focus and Collaboration Time of IC to 92% in S...
by nullindividual on Saturday August 19, 2023 @07:39PM
(#37194469)
MBAs demand rigidity in the creative process while they roll a 5d20 to come up with the percentage.
Re:Optimizing Focus and Collaboration Time of IC to 92% in S...
by waterlink on Sunday August 20, 2023 @01:23AM
(#37196357)
For the prepared items, there is actually another meeting on Friday, called Pre-Iteration Planning meeting where only Product Manager, Engineering Manager, and other necessary roles join (can be designer or QA if you have or need these). This is where work items are refined, so they are ready for estimation on Monday.
Re:Optimizing Focus and Collaboration Time of IC to 92% in S...
by waterlink on Sunday August 20, 2023 @01:27AM
(#37196370)
Regarding the productivity of engineers and schedule, the focus isn't on the individual, however, on the team and its ability to collaborate and co-create. So the optimised schedule is to increase the productivity of the team as a whole, and also use the same fixed rigid schedule to build momentum over time.
It also seems to require some sort of Agile gnomes to do the grunt work of planning, because the 55-minuute weekly planning meeting handwaves "prepared work items" into existence.