They had an initial failure, and 1 delayed but successful mission. The 3rd mission is again delayed, that’s fairly normal for manned spacecraft. Rocket science is hard, news at 11…
And again, Starliner's third attempt is now indefinitely delayed for a rebuild of critical systems.
"largely delays in funding not just the actual program" is simply not the truth.
> is simply not the truth.
Funding represents significantly more than 4 years of delays, just using their initial announcement date let alone when funding was actually provided. That’s just simple math.
There's a major difference between internal tests intended to discover problems and "we think everything's good, NASA, can we send it to the ISS?" tests intended to show everything's working.
> Funding represents significantly more than 4 years of delays
Sure. Add on additional years worth of failed tests on the actual production vehicle and you get the $1.1B in the article. Boe-OFT was now nearly four years ago.
The entire point of spending that much money was to discover problems. As to your “sure” if admit Boeings delays are less than half of total delays, that sounds like you agree with me.
Anyway, Dragon 2 as an iteration of an existing platform was by far the lower risk option. But, that’s a completely separate question.
Plenty of things were updated like IDSS, but that’s an evolution of the old docking standard etc etc. But in the end the unmanned dragon 2 is using the same Falcon 9 rocket, on literally the same mission they even call it extended dragon in several places.
The pad abort test resulted in a parachute not working - they forgot a pin. https://spacenews.com/missing-pin-blamed-for-boeing-pad-abor...
The first orbital test failed to reach the ISS because it accidentally burned too much propellant. A second error nearly made it burn up on reentry and had to be fixed in orbit.
The second orbital test failed to launch because the craft's valves couldn't handle humidity (despite being designed to launch from Florida). When it finally went (after a complete rebuild of those valves), multiple thrusters from two different systems failed in orbit.
The third orbital test - the first crewed - has been now indefinitely delayed.
It is well behind schedule.