Re:Canva saves millions annually in Amazon S3 costs
by jabart on Monday June 19, 2023 @03:05PM
(#36395260)
AWS has a talk about things like this. They were, no idea if they still do, setup an AZ based on MWH figure for most efficiency because any higher the power company doesn't like it. Our local DC the water cooling and refrigerant cooling is larger than the 5 generators they have. I've crammed a lot of servers in my rack and I'm out of power plugs but still under 2kwh of what we are on contract for. Dense servers have really messed with datacenters.
Then there was a contract which had a server room twice the size and mostly contained an AS/3<mumble> and a couple racks of Intel hardware. You could probably get a ping pong table into that one. Giant rooms that are mostly white and too cold are a little freaky, and reminiscent of 2001.
There have been a number of stories of people not being able to utilize their floor space for more servers because they ran out of space on the roof for AC units. At one point I recall Google was working on power dissipation because they had hit the max electrical code, and so no one would agree to run more power into their buildings. More servers meant more compute per watt and per ton of chillers.