Re:Designs for Battery Tankers to Transport Renewable Energy...
by pyrale on Thursday June 01, 2023 @08:54AM
(#36150427)
> having this as an option where lines are not possible (NIMBYism, etc)
Not a lot of nimbys have a backyard in the middle of an ocean, I'll grant you that.
> or in the face of natural disasters
If you really mind transporting a few generators on a plain cargo ship, this could be an alternative, I guess.
Transmission fees (FERC/federal fees): $12.92/625kWh = $0.02
Distribution fees (PUC/local fees): $25.88/625kWh = $0.04
Compared to this ship: 1000 miles: $41.5 / 1000kWh = $0.04
A full comparison would require knowing what distances NH moves power over, and what other transmission would need to be coupled with one payload from the ship. But I think that this shows the costs may be in the right ballpark. And - having this as an option where lines are not possible (NIMBYism, etc), or in the face of natural disasters, is a huge win.
Now.. is that ship electric?