Re:Inductive charging highway section to be built in Florida
by helloooooooo on Monday May 08, 2023 @11:15AM
(#35862515)
Rome wasn’t built in a day. Cali has very difficult construction challenges wrt earthquakes and land acquisition
[ Parent
| on HN ]
Re:Inductive charging highway section to be built in Florida
by sclarisse on Monday May 08, 2023 @11:27AM
(#35862667)
California’s bullet train delays have basically nothing to do with fundamental challenges like seismic engineering, and everything to do with planning permission issues / NIMBYs and California specific regulations on one hand, and with bad management on the other.
https://www.nytimes.com/2022/10/09/us/california-high-speed-...
https://www.latimes.com/california/story/2020-03-09/californ...
https://ktla.com/news/local-news/poor-decision-making-manage...