Re:Westinghouse AP300 Small Module Reactor by epistasis on Friday May 05, 2023 @12:48AM (#35825317)
France and Finland have had excessive difficulty with their EPR.

My hypothesis is that modern economies with high wages will simply not be able to build a nuclear reactor economically. It appears to require a certain amount of 20th century technological advancement, but not so much economic advancement that labor costs are too high.

France had a much better track record with nuclear in their first round of building. France can also build large construction projects without the massive cost overruns that the US has had. But they can't seem to get a next gen reactor built.

Re:Westinghouse AP300 Small Module Reactor by bjornsing on Friday May 05, 2023 @04:29AM (#35826682)
Interesting hypothesis…
Re:Westinghouse AP300 Small Module Reactor by natmaka on Friday May 05, 2023 @07:29AM (#35827878)
The first EPR project in France (Flamanville-3) had problems documented in an official report (dubbed 'Folz', per the name of its main author), sadly AFAIK it wasn't translated into English: https://www.economie.gouv.fr/rapport-epr-flamanville

A piece about it: https://www.archyde.com/the-folz-report-draws-up-a-severe-as...

This study may also offer some hints: https://www.sciencedirect.com/science/article/pii/S030142151...

Re:Westinghouse AP300 Small Module Reactor by Reason077 on Friday May 05, 2023 @07:47AM (#35828026)
It's a bit simplistic to blame only labour costs. Large, complex civil projects often have cost and schedule overruns because contractors know they're going to get paid anyway so are incentivised to make the project slower and more expensive.

Smaller, simpler projects don't tend to have the same issues because contractors know they can be replaced easily if they fail.

Re:Westinghouse AP300 Small Module Reactor by pfdietz on Friday May 05, 2023 @08:39AM (#35828458)
Renewable projects also can be rolled out in stages, so if the contractors are scammers it shows up early.
Re:Westinghouse AP300 Small Module Reactor by sofixa on Friday May 05, 2023 @09:18AM (#35828863)
Because those were the first EPRs ever. Now that most caveats and issues are discovered, next ones should be drastically faster and easier.

> France can also build large construction projects without the massive cost overruns that the US has had

Not always, some easily go overboard, like with the Parisian Philharmonic, or the absolutely massive Grand Paris Express (~200km of new high capacity metro lines around Paris) which has seen the budget go up from an original estimate of 19 billion to 35 billion (euros). Completely normal considering the scale and complexity, but still.

Re:Westinghouse AP300 Small Module Reactor by Gwypaas on Friday May 05, 2023 @11:23AM (#35830431)
Hinkley Point C, started 12 years later, is going swimmingly I hear! Going to cost the consumers ~$150/MWh and it is starting to look likely that EDF even at that incredibly high price takes a loss on it.

> Since construction began in March 2017, the project has been subject to several delays, including some caused by the COVID-19 pandemic,[10] and this has resulted in significant budget overruns. As of May 2022, the project is two years late and the expected cost is £25–26 billion,[11] 50% more than the original budget from 2016. It is currently planned to be commissioned in June 2027 and has a projected lifetime of 60 years. In February 2023, EDF announced that costs would rise to £32.7bn and completion would be delayed by a further 15 months to September 2028.[2][12]

https://en.wikipedia.org/wiki/Hinkley_Point_C_nuclear_power_...

Re:Westinghouse AP300 Small Module Reactor by sofixa on Friday May 05, 2023 @11:48AM (#35830819)
Started before all problems had been fixed with Flamanville and Olkiluoto, it's a part of the initial generation.
Re:Westinghouse AP300 Small Module Reactor by Gwypaas on Friday May 05, 2023 @11:50AM (#35830866)
Is not the definition of insanity is doing the same thing over and over and expecting different results?
Re:Westinghouse AP300 Small Module Reactor by sofixa on Friday May 05, 2023 @12:34PM (#35831680)
When building complex infrastructure for the second/third/etc. time? Of course not. Economies of scale is the term you're looking for.
Re:Westinghouse AP300 Small Module Reactor by Gwypaas on Friday May 05, 2023 @01:00PM (#35832069)
Hinkley is the fourth time, still no dice.
Re:Westinghouse AP300 Small Module Reactor by epistasis on Friday May 05, 2023 @04:57PM (#35835077)
When has nuclear ever had economies of scale?
Re:Westinghouse AP300 Small Module Reactor by epistasis on Friday May 05, 2023 @01:36PM (#35832564)
Do you have any examples of a very high cost reactor dropping by a significant amount on a subsequent build?

South Korea was able to eke our small decreases in cost (though some people have ended up in jail for falsifying record keeping). But otherwise, costs tend to rise. And I'm definitely not aware of a drop of 50% or so, to bring these excessive costs into the realm of competitiveness.

Re:Westinghouse AP300 Small Module Reactor by przemo_li on Friday May 05, 2023 @09:35AM (#35829023)
French scenario could have been avoided is much better loans where secured. Delays skyrocketed costs for to fat % on those financing agreements.

Which is 101 of big projects anyway. Hard to understand why french project wasn't deemed to risky to investors.