All projects do, including wind and solar.
--- start quote ---
Ernst & Young (EY) has found that an average power and utility megaproject is delivered 35% over budget and two years behind schedule
Of the megaprojects surveyed, 64% were delayed and 57% were over budge. Almost three-quarters of hydropower, water, coal and nuclear infrastructure projects were over budget by 49% on average,
--- end quote ---
https://www.offshorewind.biz/2016/12/02/offshore-wind-projec...
> And realizing ten times the current building capacity for nuclear plants
How much do we need to overbuild wind and solar?
There is no need to "overbuild" wind or solar. There has never been any illusion those sources will produce at 100% capacity all the time. There will eventually be energy storage to level out the peaks, but most countries still have years to build up to the point where this is necessary.
Which grid-scale solar projects have gone into production on schedule and under budget? Are there any?
Here's what the researchers found for solar (section 3.4):
Thirty-nine solar PV and CSP power plants, representing 2374 MW of installed capacity and $16.5 billion worth of investment, were analyzed. (These are utility-scale infrastructure projects, thus they do not include the familiar rooftop solar collectors on buildings or residential configurations.) These projects as a class actually came in $4.2 million less than budgeted, or $200,000 less than expected per project. These solar systems had the lowest average cost escalation per reference class (1.3 percent), the least time overruns (an average of 2 months ahead of schedule), and the lowest standard deviation for amount of overruns and time overruns. They also had the largest total amount of cost underruns, with the entire class of projects costing $163.9 million less than budgeted, though some of this may be explained by dramatic reductions in cost over the past 4 years. As Table 5 indicates, only 3 facilities had overruns greater than $50 million and only 3 facilities had cost overruns greater than 30%, all of which were CSP facilities rather than large-scale solar PV apparatuses.
Here are a few solar projects that outperformed in recent years:
O'Brien Solar Farm in Wisconsin, completed in 2021, on time and under budget:
https://www.boldt.com/project/edf-renewables-obrien-solar-fa...
Mount Signal 3 in California, completed in 2018 ahead of schedule:
https://www.solarpowerworldonline.com/2018/12/8minutenergy-c...
Sun Streams 2 in Arizona, completed under budget and ahead of schedule in 2021:
https://www.enr.com/articles/55112-best-project-energy-indus...
Hillston solar farm in Australia, reached full commercial operation in 2022 ahead of schedule:
https://www.solarquotes.com.au/blog/hillston-solar-farm-mb24...
Kuala Ketil Solar Farm in Malaysia, completed in 2019 ahead of schedule:
https://www.pv-magazine.com/2019/09/12/50-mw-solar-park-come...
[1] https://www.qualenergia.it/sites/default/files/articolo-doc/...
The closest I see in that list is Mount Signal 3, which comes in at about 1/3 the capacity of a typical grid-scale generating station (1/6 if you account for the fact that it's producing zero power half the time, on average). It also chews up nearly 2,000 acres of land.
https://www.eia.gov/todayinenergy/detail.php?id=7290
The table above shows that the coal generators that retired between 2009 and 2011 had an average size of 59 megawatts (MW). By contrast, the average size of a coal-fired plant planned for retirement between 2012 and 2015 is 154 MW, more than twice the average size of the units retired during the 2009-2011 period.
In 2022, coal fired generators had a capacity factor of ~48% in the United States:
https://www.eia.gov/electricity/monthly/epm_table_grapher.ph...
Photovoltaic solar farms attained ~25% capacity factor in 2022:
https://www.eia.gov/electricity/monthly/epm_table_grapher.ph...
So as a rough guide you can estimate that a solar farm will generate about as much electricity annually as a coal plant with half the nameplate capacity. The Signal 3 facility would roughly match a 164 megawatt coal generator for annual generation.
164 megawatts (328 / 2, to account for the fact that solar plants are offline a minimum of half the time) is not anywhere in the same league as nuclear power plant, which are typically in the 2-3 gigawatt range, with modern large-scale plants producing 6-8 gigawatts.
The Mount Signal 3 plant also used up 2,000 acres (800 hectares of Imperial Valley farm land.
Your comparison is meaningless, because the 150 billion € investment is not comparable to a single nuclear plant.
And realizing ten times the current building capacity for nuclear plants with the same (or stricter) regulation and standards? That is almost delusionally optimistic.