Re:Spanish rail's costly blunder: New trains too large for t...
by linker3000 on Saturday February 11, 2023 @05:50PM
(#34757254)
The UK's Southern/South Eastern region train networks have third rail power pickup.
- how power is delivered through the overhead wire (direct or alternating current, switching frequency, voltage), often even within a country, for example because high speed rail needs more power and cannot use what’s used elsewhere (https://en.wikipedia.org/wiki/List_of_railway_electrificatio...)
- platform height (again, often even within a country. See https://en.wikipedia.org/wiki/Railway_platform_height)
Two centuries of work leads to significant technical debt.