News for hackers. Stuff that matters.
Re:The UK is wasting a lot of wind power by throwaway2037 on Thursday January 12, 2023 @07:44PM (#34362478)
"Under construction now."

Wiki says: https://en.wikipedia.org/wiki/Australia-Asia_Power_Link

    projected to begin construction in mid-2023
And:

    In January 2023, Sun Cable went into administration, the equivalent of Chapter 11 Bankruptcy.
Re:The UK is wasting a lot of wind power by entropicgravity on Thursday January 12, 2023 @09:34PM (#34363287)
OK sure, that particular project may have been halted but it's not because of technical problems. And plenty of HVDC transmission lines have already been built. The key thing about HVDC is that it follows a dropping price curve similar to semiconductor manufacturing so prices will continue to come down.
Re:The UK is wasting a lot of wind power by defrost on Thursday January 12, 2023 @09:43PM (#34363359)
The cable and power transmission parts of that scheme were sound - the routing across one of the more volcanic and faulted geological regions in the world was sketchy.