Imagine if NASA was solely located in Alabama where von Braun set up shop. I think it would have been defunded in short order and there would be no NASA and, by extension, no SpaceX (since they are so reliant on govt contracts)
Put JPL in California, mission control in Texas, launches in Florida, and a bunch of manufacturing at Boeing and you've got a much, much wider Congressional support base.
Look at https://www.nasa.gov/specials/ESDSuppliersMap/ - they've even managed to spread suppliers around to Alaska, Montana, and Hawaii. Every single state has at least some jobs that depend on SLS.
The political risk is the more salient point to me, and jobs is just a way to mitigate it. (You could also, for example, mitigate it with less productive means like lobbying)
(Suppliers is a different story. A lot of time NASA is handcuffed by which suppliers actually want work with them. There’s a lot of hoops to jump through and many suppliers just don’t find it worth the hassle)
1) The requirements aren't levied by congress. They are created by NASA civil servants who are usually the technical experts in a particular field. These aren't people who have much of any interface with lobbyists.
2) A lot of the instances where it's not worth it to suppliers isn't because they are being boxed out by some industry giant clamoring for some giant contract. It's usually closer to "it's not worth our effort to overhaul our manufacturing process to meet requirements so we can sell NASA a $70 teflon seal." The giant corps have little desire here either. But being a big manufacturer is sometimes correlated with having a more mature manufacturing process that meets specific standards.
There’s already enough corruption in govt, we don’t have to make believe it’s in places that’s it’s not.
Is there any infrastructure there for the mission? My cynical side wonders if someone flew to Honolulu, went to a hardware store to pick up some JB Weld, and flew it back to Florida just so they could check off Hawaii on the list of states.
It also doesn’t mean they want spaceflight material. It can just be something needed to support the project, like shelving to hold extra parts. But it the charge code is traceable to the program, it makes the list.
* this is also why SpaceX can do things cheaper. They don’t have the same quality requirements so they can streamline their processes. Sometimes that’s good, sometimes not: https://parabolicarc.com/2016/06/28/nasa-investigation-space...
I recall some NPR story recently about war games the US runs about a hypothetical war with China -- it was said that the US loses most of the time in these simulations. Why? A lack of industrial capability.
Zero of which are currently capable of putting a human around the Moon.
Prove yourself and the contracts get bigger.
NASA budget is like 30% SLS/Orion for decades+.
> Prove yourself and the contracts get bigger.
If you hard allocate a huge part of the budget you can only give out so many other contracts for the best bids.
Astra, Rocket Lab, etc. have to demonstrate capability to move up the ladder.
So, 'currently' is doing a lot of heavy lifting there, not to mention in general the idea of SLS being ready to send people to the Moon now is a bit of a stretch too since Artemis II will be ready to launch in 2024 if we're lucky, which is also when (if we're lucky), Lunar Starship should be starting its testing.