Re:The first Gen III+ Nuclear plant begins fuel loading
by Dylan16807 on Monday October 17, 2022 @04:28PM
(#33239115)
It's still part of the same grid as non-baseload generation, so the lack of flexibility makes the entire grid less flexible. So yes it's a negative.
And most people would call "can't be used for the more difficult parts of power generation" a negative too.
Not for baseload generation.