Re:The first Gen III+ Nuclear plant begins fuel loading by realusername on Friday October 14, 2022 @03:29PM (#33207831)
See how this strategy is turning out in Germany right now, turns out this "cheap cheap cheap energy" was not including the diplomatic, environmental and financial costs of the gas backups.
Re:The first Gen III+ Nuclear plant begins fuel loading by croes on Friday October 14, 2022 @03:42PM (#33207959)
How was the nuclear nuclear nuclear energy in France going? Germany had to burn more gas to substitute for France's downtime of nuclear power plants.

The cost and time for the construction of new one not included and the risk of sabotage not mentioned. I bet russia will at least try to damage them as a revenge for the help of Ukraine.

Re:The first Gen III+ Nuclear plant begins fuel loading by themaninthedark on Friday October 14, 2022 @04:13PM (#33208309)
Well, if Germany had more nuclear power they would not be burning gas to help France during the French downtime now would they? Nor would they be restarting coal power plants, the dirtiest form of energy.

It's funny how the Green idea of a large grid that shares power, i.e. it's always windy somewhere, suddenly falls flat when the neighbors wind(nuclear, in this case) is no longer blowing.

The only fault of France is trusting Germany to have a sane power production plan when they entered a peering agreement with them.

Re:The first Gen III+ Nuclear plant begins fuel loading by croes on Friday October 14, 2022 @04:30PM (#33208464)
If Germany would have more nuclear power plants it would have more nuclear waste without nuclear repository.

More problems like Asse and Brunsbüttel

Re:The first Gen III+ Nuclear plant begins fuel loading by croes on Friday October 14, 2022 @04:36PM (#33208526)
>it's always windy somewhere, suddenly falls flat when the neighbors wind(nuclear, in this case) is no longer blowing.

There is a difference between the outage of an nuclear power plant and the outage of wind turbine.

One power plant less has a much bigger effect than thousand wind turbines without wind. Nuclear power plants are the equivalent of Cloudflare, one outage has massive effects. Wind turbines are decentralization and that's better especially since Russia return as the bad guy.

Didn't hear much fear about Ukrainian wind turbines but lits of worries about nuclear power plants.

Re:The first Gen III+ Nuclear plant begins fuel loading by themaninthedark on Friday October 14, 2022 @05:06PM (#33208793)
Yes, one nuclear power plant has greater output than a large number of wind turbine. That is not what the analogy was about.

The analogy is about how people pushing for wind and solar only/main are relying on every other area to be able to pick up the slack when their area is down. And the fact that they are not able or willing to pick up the slack when someone else's area is down.

Your comment was that Germany is having to support France while they have their reactors down and viewing that in a negative light. If France was supplying power to Germany during a lull in the wind, the response would be "This is just so, even though the wind does not blow all the time, with enough interconnects we can ensure that a green grid is possible."

There was even talk about expanding Europe's grid across to Libya in order to ensure that the wind would be blowing somewhere.

That is just holding one energy source to an impossible standard(i.e. zero downtime) while giving generous excuses to the other.

Re:The first Gen III+ Nuclear plant begins fuel loading by realusername on Saturday October 15, 2022 @04:35AM (#33212985)
You can't replace a nuclear plant with wind turbines. Just to replace Fessenheim (the french plant the greens closed), you would need 20k turbines ... without taking into account backups
Re:The first Gen III+ Nuclear plant begins fuel loading by Schroedingersat on Saturday October 15, 2022 @10:36AM (#33215216)
https://en.wind-turbine-models.com/turbines/2338-mingyang-my...

Last I checked 1840 was not 20,000 times 16. And an ancient leaking nuclear plant barely has a higher capacity factor than current gen offshore wind.

Re:The first Gen III+ Nuclear plant begins fuel loading by realusername on Saturday October 15, 2022 @11:18AM (#33215579)
A typical wind turbine on earth is more like 1.5MW... This outlier isn't representative of anything and it's not like you can build sea turbines ... in the east of France.

> And an ancient leaking nuclear plant

According to whom? Not the nuclear safety bodies at least.

> current gen offshore wind.

Those are a bit worse than nuclear plants but take roughly the same time to build anyways, the one in France which just went into production took 10 years of development + 4 years of planning so about 14 years.

Re:The first Gen III+ Nuclear plant begins fuel loading by Schroedingersat on Saturday October 15, 2022 @09:00PM (#33220151)
If you're including development then vogtle started in the 90s. And 1840 is...1840 times 1 not 20,000

Which is still about half of the net capacity of new onshore wind. And every year the turbines get bigger.

Dogger bank is a first of its kind project and is on schedule for first power 5 years after site selection.

Hornsea one was one year from construction start to first power and two years to full operation.

Hornsea two was six years from planning start to full operation

Gemini was two years from construction start to full operation.

Triton knoll was five years from planning approval to full operation

Re:The first Gen III+ Nuclear plant begins fuel loading by themaninthedark on Saturday October 15, 2022 @10:46PM (#33220632)
From Wikipedia: >On August 15, 2006, Southern Nuclear formally applied for an Early Site Permit (ESP) for two additional units. The ESP determined whether the site was appropriate for additional reactors, and this process is separate from the Combined Construction and Operating License (COL) application process.

Part of the reason that the construction took so long was that the containment building was redesigned to be stronger, that caused a redesign of all the internal components that were already being built.

> In December of 2011, a 19th revision was written for the AP1000 Design Certification, which effectively included a complete redesign of the containment building: >The wall is appropriately reinforced and sized where the composite wall module joins the reinforced concrete sections and as appropriate to accommodate seismic loads and aircraft loads. This design is new to the amendment; previously the structure was all reinforced concrete. >As this change to the design requirements was made after engineering contacts were already signed and manufacturing had begun on the reactor's long-lead-time components, it resulted in a halting of construction as the containment building had to be re-designed.

For a large scale project that had the design changed drastically, I think 10 years is not bad.

Re:The first Gen III+ Nuclear plant begins fuel loading by Schroedingersat on Saturday October 15, 2022 @11:42PM (#33220860)
The main difference being that this always happens.

> On August 26, 2009, the Nuclear Regulatory Commission (NRC) issued an Early Site Permit and a Limited Work Authorization. Limited construction at the new reactor sites began,

13 years and counting, 14 if nothing else goes wrong (unit 4 scheduled for end of 2023).

Then there's all the projects that go the way of VC Summer which get conveniently forgotten about. Vogtle is the 'success' story.

Re:The first Gen III+ Nuclear plant begins fuel loading by themaninthedark on Sunday October 16, 2022 @09:58PM (#33229104)
The main takeaway from that is that 2009 is not the 90's.

California is building a new desalination plant, a fairly straightforward project with no surprises or midstream design changes, construction is expected to take 3 years.

Let's look at something simple, such as a railway in California. >On December 2, 2010, the Authority Board of Directors voted to begin construction on the first section of the system from Madera to Fresno. >In July 2012, the California legislature and Gov. Jerry Brown approved construction of the high-speed system. >Fresno hosted a groundbreaking ceremony on January 6, 2015, to mark the commencement of sustained construction activities.

It took 5 years from the vote to begin construction to groundbreaking. In 2022, there is still not a ride able section of track yet. The Fresno station, where groundbreaking occurred is scheduled completion in 2029. 14 years, or about the same length of time as Vogal if everything stays on track.

The point is, big construction projects take time and are complicated. If they whipped up a nuclear plant in 3 years, there would be fear mongering about how they must have cut corners and it is unsafe.

We could get the plant completion times down by committing to build more of them. Then all the large and specialized components would be built in more of a production manner rather than a bespoke manner, allowing for both cost and time savings.

Re:The first Gen III+ Nuclear plant begins fuel loading by Schroedingersat on Sunday October 16, 2022 @10:28PM (#33229286)
> We could get the plant completion times down by committing to build more of them. Then all the large and specialized components would be built in more of a production manner rather than a bespoke manner, allowing for both cost and time savings.

If that's true then go for it (it never happened in the past -- costs increased exponentially even before three mile island), but don't ask for special treatment. Whatever deal you demand in terms of fast tracking environmental assessment, guaranteed loans, billions of dollars for free insurance, public resources for security and 40 year guaranteed price for generation should be available for anyone who can meet the 50g carbon intensity target, risk of major accident, and a minimum availability. If you need just two (or ten) more $13/W projects to get you started, then offer the same $30 billion guaranteed loan to tidal and see what happens.

On a level playing field noone in their right mind is going to choose to build nuclear.

Re:The first Gen III+ Nuclear plant begins fuel loading by Schroedingersat on Monday October 17, 2022 @12:21AM (#33229789)
Alright. Think of it a different way.

I give you the nuclear heat source up front for free. Brand new AP1000 appears up to the second cooling loop by magic.

Steam turbines sans the emission control equipment are about $3k/kWe

Fuel rods are $10-20/MWh. Take it at a constant $10 for an AP1000 (costs of uranium and SWUs go up, but fuel efficiency and fabrication improves at about the same rate).

Decomissioning is underfunded at $10/MWh but we'll pretend this is enough

O&M costs for a steam turbine sans fuel is $10/MWh

Demonstrate how nuclear makes sense with these constraints vs wind at $2000/kW net or solar at $2500/kW net while the gas turbines still run.

Demonstrate how nuclear makes sense vs. Projected costs of pv + wind + h2 + batteries.

Re:The first Gen III+ Nuclear plant begins fuel loading by themaninthedark on Friday October 14, 2022 @04:47PM (#33208637)
So Germany's inability to deal with their nuclear wast excuses them from spewing waste(CO2) out the end of a smokestack that we all have to deal with?

How is France dealing with their waste? Can Germany pay France to take it?

Re:The first Gen III+ Nuclear plant begins fuel loading by croes on Friday October 14, 2022 @08:19PM (#33210329)
France still has no definitive way to cope with it's nuclear waste.

Germany's CO2 output is thanks to some politicians who sabotaged the expansion of renewable energy on purpose.

Re:The first Gen III+ Nuclear plant begins fuel loading by realusername on Saturday October 15, 2022 @04:31AM (#33212964)
Germany spent 2x the whole french grid just on renewables already and it still does not work. How much do they need to spend? 4x, 10x ?
Re:The first Gen III+ Nuclear plant begins fuel loading by realusername on Saturday October 15, 2022 @04:29AM (#33212949)
Nuclear issues in France are due to the french greens who lobbied to stop investments hoping that renewables would take over (hence the crisis because they were wrong)

The crisis in both countries is caused by renewables, just in different ways

Re:The first Gen III+ Nuclear plant begins fuel loading by lispm on Saturday October 15, 2022 @02:01PM (#33217061)
That's nonsense. The crisis in France is because of aging reactors needing quite more maintenance.

The reactor France builds is many years late and extremely expensive. France has for decades extremely nuclear friendly governments. The actual problem is money, number of engineers, technical capabilities, ...

Re:The first Gen III+ Nuclear plant begins fuel loading by realusername on Saturday October 15, 2022 @02:13PM (#33217167)
The investments stopped on the last 20 years because the greens thought that renewables would take over, they even put the reduction of nuclear straight into the law.

To my knowledge, that's the only form of energy with a specific target of reduction in the law, not even petrol is subject to it.

The truth is that the nuclear grid is holding up quite well considering those facts, I don't know anything else where which would still work after two decades being forced to sell electricity below production costs to "competitors" (another subject)

> France has for decades extremely nuclear friendly governments

No it hasn't since the 90s at best.

Re:The first Gen III+ Nuclear plant begins fuel loading by lispm on Saturday October 15, 2022 @03:22PM (#33217762)
> the greens

There were never greens in the French government.

> they even put the reduction of nuclear straight into the law

after decades of little investing in renewable energy, which is now cheap. France has a long coast and lots of sunshine...

Example: there are thousands of offshore wind turbines in Europe. A tiny fraction of those are in France.

> two decades being forced to sell electricity below production

The French nuclear industry now is mostly government owned. It picked up the failed business of EDF, which had debt of around 60 billion euros from exploding costs of new reactor constructions. It was always a political instrument to sell cheap electricity, while the tax payer pays for the hidden additional costs.

Re:The first Gen III+ Nuclear plant begins fuel loading by realusername on Sunday October 16, 2022 @10:47AM (#33223993)
> There were never greens in the French government.

France is a democracy, you don't need to be in the governement to have an influence. They had agreements with Chirac and then Hollande against nuclear for their votes.

> after decades of little investing in renewable energy, which is now cheap. France has a long coast and lots of sunshine...

France has invested half of the total price of the nuclear grid in renewable. I do agree that those tremendous renewable investments went poorly though.

Since you're talking about wind turbines, the last one opened took 14 years to build.

> The French nuclear industry now is mostly government owned. It picked up the failed business of EDF, which had debt of around 60 billion euros from exploding costs of new reactor constructions. It was always a political instrument to sell cheap electricity, while the tax payer pays for the hidden additional costs.

Again, I don't see how anything else would have been better. Renewable companies won't last 20 years without investments (that's the full lifetime of solar and wind turbines anyways...) and forced to sell electricity below production cost to their competitors.

Re:The first Gen III+ Nuclear plant begins fuel loading by lispm on Sunday October 16, 2022 @02:00PM (#33225692)
> France is a democracy, you don't need to be in the governement to have an influence.

Real influence is when a party is part of the government, has ministers, etc. Like the greens in Germany.

Just see the difference renewable energy for electricity production in France is at 20%. In Germany it's currently at around 50%.

If the 'greens' had any influence in France, this influence is not very visible in the results.

> I do agree that those tremendous renewable investments went poorly though.

The investments in nuclear went much worse: half of the reactor fleet is offline and more than a hundred billion Euros is needed for this fleet just to keep it running and replace some of these aging reactors. No wonder EDF is nationalized, with huge debt and billions of more needed - a normal company would already be bankrupt.

> Renewable companies won't last 20 years without investments (that's the full lifetime of solar and wind turbines anyways...) and forced to sell electricity below production cost to their competitors.

Renewables are currently the cheapest source of electricity and its getting cheaper.

Nuclear is only getting more expensive. See the French nuclear power plant in UK (Hinkley Point C), which a very expensive way to produce electricity. Delayed. Cost increases.

https://www.theguardian.com/uk-news/2022/may/20/hinkley-poin...

The new cost increases are paid by the French tax payer.

Re:The first Gen III+ Nuclear plant begins fuel loading by realusername on Monday October 17, 2022 @03:09AM (#33230585)
> Real influence is when a party is part of the government, has ministers, etc. Like the greens in Germany.

Yes that's what happened. Real influence is when you sign agreements for your votes at the presidential election in exchange for a few ministers, exactly what the greens did during the past 20 years.

> If the 'greens' had any influence in France, this influence is not very visible in the results.

I can point at actual laws propped up by the greens against their votes if you want, at this point it's just denying reality.

> The investments in nuclear went much worse: half of the reactor fleet is offline and more than a hundred billion Euros is needed for this fleet just to keep it running and replace some of these aging reactors. No wonder EDF is nationalized, with huge debt and billions of more needed - a normal company would already be bankrupt.

Well that's what happens when you stop investments and force selling electricity to below production costs yeah, again you're lucky it's nuclear we're talking about, it would be renewables, the production would have dropped to zero at that point.

> Renewables are currently the cheapest source of electricity and its getting cheaper.

France spent around half the price of the nuclear grid on renewables ... for 7% of the production. This puts it at around 5 times more expensive than the existing nuclear grid without taking into account the backup infrastructure.

The french investment on renewable was one of the most expensive with the lowest output ever performed by the country

This also did not help the current situation either.

Re:The first Gen III+ Nuclear plant begins fuel loading by lispm on Saturday October 15, 2022 @01:58PM (#33217038)
Gas in Germany is mostly used for heating. There is not much Germany can do with gas to support France, where 26 (!!) nuclear reactors are offline. France supplies Germany with gas. Germany tries to support France with some electricity, but the majority of the will come from coal or renewables.
Re:The first Gen III+ Nuclear plant begins fuel loading by epistasis on Friday October 14, 2022 @08:06PM (#33210260)
When Germany bought a lot of solar, it was not cheap. Germany's purchase are one reason that solar is so cheap today.