Re:Deutsche Bahn’s Meltdown and High-Speed Rail
by ssl232 on Monday July 25, 2022 @04:31AM
(#32221867)
You don't need separate stations, just enough separate tracks. Berlin Hbf for example has its ICE trains mainly arrive in the basement level, with regional and local trains on physically higher levels (worth seeing for anyone visiting). But most large cities' main stations have 10+ parallel tracks, usually with a large junction a km or so each side to let trains funnel into the correct platform (see e.g. Hannover: https://www.openstreetmap.org/#map=14/52.3813/9.7435). Plenty of room for local, regional and ICE trains to be all together.
[ Parent
| on HN ]
Re:Deutsche Bahn’s Meltdown and High-Speed Rail
by schroeding on Monday July 25, 2022 @04:39AM
(#32221930)
Yes, you're right. That was what I actually meant, sorry for being unclear. They should share the actual building, but not the platforms and (idealy) tracks.