Germany is a manufacturing powerhouse. Why can't they build them?
Sure. Can you get millions, though?
Even something comparitively simple like toilet paper took months at the start of the pandemic.
Yes, but government can provide a demand signal far more clearly and immediately than the market can. That's what the Defense Production Act is for in the US.
The lack of federal tax incentives for air source heat pumps is also an an issue. Frustratingly there is a 30% credit for ground source heat pumps, which are far less scalable because they require an expensive trench or well.
The same therm of natural gas that would have been burned in a domestic gas boiler, if burned in a modern combined cycle gas electricity plant, can provide 2-3X the amount of domestic heat via heat pumps even in the coldest conditions. In shoulder seasons it's more like 3-4X.
The load we need to expand electricity production for is EVs, which use a ton of it comparatively.
There is an alternative: heat pumps. The problem is the upfront cost, which needs to be lowered through economies of scale.