Re:Switzerland’s underground freight project gets start date
by cm2187 on Sunday June 26, 2022 @04:08AM
(#31882032)
In fact throughput is sometimes the main constraint on speed. Apparently the high speed train service on some of the busy french lines (like Paris-Lyon) is lower than what these trains would normally operate at so the safety distance can be reduced and the number of trains increased.
[ Parent
| on HN ]
Re:Switzerland’s underground freight project gets start date
by sandworm101 on Sunday June 26, 2022 @08:06AM
(#31883202)
Which makes it ironic that planes can get a higher throughput than trains. Despite thier higher speeds, planes can be landed as close as one minute appart. High-speed trains must often stay several minutes appart. Thats the advantage of having access to two/three dimensions of movement over a train's one.
Re:Switzerland’s underground freight project gets start date
by imtringued on Monday June 27, 2022 @02:47AM
(#31891354)
You completely ignored the cargo capacity or number of passengers.
Re:Switzerland’s underground freight project gets start date
by sandworm101 on Monday June 27, 2022 @06:06AM
(#31892546)
Run the math. 400+ people/minute for a runway is actually much higher than any rail line.
Re:Switzerland’s underground freight project gets start date
by _Tev on Thursday June 30, 2022 @09:21AM
(#31932026)
Subway is kind of a rail line and Prague line C subway has sub 2min intervals in peak, with each train having capacity of 1000 passengers. So 500+people/min. EDIT: official number is 448 passengers / minute - https://en.wikipedia.org/wiki/Line_C_(Prague_Metro)
That's an extreme case of rail line, but "much higher than any rail line" is kind of extreme phrasing too :)