>Why does engineer or constructor worker understand that you need planning to align thousands of people over many years to build a great big thing
You're conflating "needing to align thousands of people" with "needing a fancy system which pulls everyone in its web to deal with multiple times a day". If anything, construction shows just how little ICs need to know to function. You don't boggle your construction workers with bureaucracy, you take it away and let architects, managers and foremen deal with it.
There are an incredible amount of project managers running from place to place on a construction project keeping teams in line. Construction work, design blueprints, government regulator, there are SO many teams and SO many project managers running between them.
JIRA is absolutely a net positive in that environment. A centralized system like JIRA alleviates that.
Again, give some actual proof. It's about time we stop clashing rationalities and face the music. If it's this easy to come to a "rational conclusion", it shouldn't be much harder to pull evidence.
In the lean analysis, the problem isn't changing requirements, which is a natural consequence of changing circumstances and people learning over time. The problem is building up a large inventory of poorly-tested, underinformed plans and then doing a lot of work based on them without taking advantage of the opportunities to learn.
Especially here on HN, we know that startups don't succeed because they come up with a fixed initial plan and then spend years marching to it. Instead we have all set of techniques for releasing early and often so we can see what really works for users. A key competitive advantage for startups is how their fast OODA loops allow them to run rings around larger companies that slowly drift into being very plan-based.
However, you should watch the Poppendieck talk I linked. The Empire State Building had construction start before they finished designing it. The waterfall hallucination, where people imagine perfect results come from perfect plans perfectly executed, has been hugely enabled by software. But if we look at the actual results of heavily planned activities, like buildings, roads, and weapons development, the track record is terrible.
So if modern planning techniques don't work well even in areas, like construction, that they are most suited for, then it should be no surprise that people are skeptical when they are applied to domains that are very different, like software.
I mean, as a single individual, in some circumstances, sure.
If we think a bridge or railroad or spaceship get built without fancy planning, we've taken our software engineering paradigm to new level of delusion. Why does engineer or constructor worker understand that you need planning to align thousands of people over many years to build a great big thing, but we feel in software we are just too darn special of snowflakes to need or agree to that?
Sorry if I got your comment way out of context or scope, but it just struck me as a very circumstantial statement, but one that is bandied a lot as a generically applicable one - which it isn't. For many things you need very fancy planning indeed.