Sounds like the manager was in over their head.
Engineering team will always have items that are very hard to estimate without doing background work.
A good manager would have said "what do we need to do to figure out times?" and then "Can we timebox that research to a sprint / two sprints / etc?" are reported the horizon one timescale up.
that part of the story was really a microcosm of the gap that exists between individual contributor vs manager; the former 'does the work' whilst the latter needs to report the progress of that work 'upstairs', an archaic yet persistent organisation of labour