News for hackers. Stuff that matters.
Re:Watch a highway bridge be replaced in under three days, live by bombcar on Friday April 22, 2022 @01:38PM (#31125161)
According to the FAQ https://verandaplan.org/faq the road under the bridge is closed for 7 days (already closed) and the highway is closed for 3.

All in all that's a pretty low amount of time; often these are done by closing the road under for an unspecified amount of time, diverting all traffic onto one bridge span (reduce to one lane in each direction) and replacing the bridge a half at a time.

There are no comments on this comment yet.