Big projects have almost unlimited liability. The entities involved can get taken to court for pollution concerns, environmental concerns, get caught up in local politics. And once something is in the courts, the whole timeframe is completely up in the air.
One of the places I lived had Walmart wanting to build a Walmart Supercenter, and convert their current Walmart into a Sams Club. The non Walmart grocery store (which was garbage in terms of quality and service) and a Sams Club competitor tied up Walmart in court over the status of some endangered garden snake.
It was obvious nonsense, but it would have taken so long to untangle legally that Walmart said screw it and moved on.
On the other hand, time and materials contracts have exactly the problems you would expect.
I honestly don't know how these things should be done so that taxpayers get the most value for their dollars. But I do know it's more complex than just "fixed price contracts."
The first two options have been removed from the toolbox of American government almost entirely.
How would you measure and enforce this?
This system of incentives and disincentives does work, and the US had a better handle on it in the past.
(I don't know if contractors bid below cost.)
How often in software do we see a half finished product or product not designed to scale and we have to start over from the beginning to get it where it needs to go?
You think this doesnt happen in construction projects too? Half building a bridge that you then need to tear down is awful and should not happen. You are just assuming its possible to finish the rest of the bridge later and that critial parts will be available later and that it being in a half finished state for a period of time doesnt cause major issues to the whole thing.
The US has one of the most well-funded legal industries and we are worried that we can't write a complicated and thorough legal contract to do work? Doesn't really make sense.
If the winner cuts the corners and doesn't deliver, they get sued in US's extremely thorough courts. I also think the bar for applying for these contracts should be higher. Firms with liquidity, track record, etc. get the best jobs.
One model I haven't heard of, is the government as general contractor, hiring and managing the subs directly. I could imagine a hybrid mode like this could work.
Because no legitimate construction firm will take on a project where they are saddled with 100% liability for overruns.
Not without very generously padding their estimated costs, that is.
Which will make them lose the initial bid.
A fly-by-night operator may want to take that project, and when things go sour, they'll leave you with a half-built bridge, and an empty shell of a corporation that you won't squeeze a dollar out of.
That, however, would be socialism, so it can't be done, even though it's done on a smaller scale in every US city for issues starting at road repair and going on up.
Not sure what happened and why cities stopped having all these capabilities on staff (seems obvious that e.g. NYC will eternally need a huge amount of people like this).
We don't build enough because building is expensive, and building is expensive because we don't build enough.
When we don't build enough, a crown corporation dedicated to building is not going to have enough consistent work to justify its existence.
The contractor can accurately price in (and insure against) technical risks like the risk of accidentally striking a cable while digging, and they can mitigate this as well (looking at the quality of cable mapping data, using detectors etc.)
What the contractor can't factor in is all the (local) government politics and bureaucracy. Where things fall on the financial year calendar, whether they will have to spend the money before or after April, whether they will have to pause works because a resident legally challenges the works, whether the client has even asked for the right thing, or if it will emerge while planning the work that they have made major errors etc.
When dealing with a well-specified, fixed-scope piece of work, you are right - the provider should eat that. When dealing with an uninformed non-expert customer (i.e. most public sector or government contracts), nobody in their right mind would take on that risk, except some of the big government outsourcing contractors, who would all quote insane prices based on past "actual costs" after factoring in all the nonsense from previous work.
I agree that all government contracts should be fixed bid. It is wholly the contractor's responsibility to determine if they can be profitable on the contract or not. We should not be on the hook for added cost.
You ask for A, get quoted $X; but if then after the public input (which, as the article states, can't be avoided or its suggestions refused, because votes and politics) you decide that you actually want A+B+C+D+E+F+G (it's not an exaggeration, it's common for the "add-ons" to require multiple times more work than the initially requested thing) then you're not getting that for $X no matter how you write the contract.
If someone is painting your house and halfway through the process you discuss with your family that it needs to be a different color (redoing the already painted parts) and the kids room also needs to be painted, and oh, they should fix the porch before painting it, that's going to result in cost ballooning far above the quote.
When a service is to be provided at a certain cost, it should be provided at certain cost. Some contingencies should be built in (if something gets discovered that was unexpected) but how on earth does every municipal project seem to have so much invested in budget oversight and contractors overbilling or needing overtime to make things happen.
If someone is painting my house, I get a quote for the job and the date it will be completed. I don't find myself paying them more unless its for something outside of what we specified together and they quoted.
Building on government contracts should be solid money but it seems like every time the taxpayer gets fleeced and the end result is barely functional/impactful.