Re:Even with Agile and Scrum waterfall will sneak in
by jollybean on Monday December 06, 2021 @10:15AM
(#29460671)
The issue is not cement or how long it takes to be cured, rather the crude and easy determinism of it all.
Home builders don't generally face existential struggle with the timing of the issue.
You don't go 5x over budget and have it take 5x longer because of this.
You can reliably schedule around cement.
Here's exactly the same article but translated for a UK perspective, it's hilarious
https://www.ehow.co.uk/about_4674117_were-concrete-blocks-fi...
> Do not pour concrete in temperatures below -6.67 degrees C.
> Temperatures of 21.1 degrees C compared to 10 degrees C, for example, reduce the 50 per cent strength curing time from 6 to 4 days