> Dry in can be quicker.
I find that concept pretty fascinating. Here in the PNW we don't typically see balloon framing, but even so the dry-in time is still really quick. A two-story house can be framed up and have roof sheathing on in a week or so, and in another week have the roof and tyvek on. Even if the entire process was done in a downpour it still doesn't take long after that before it's dry enough to start interior work.
I find that concept pretty fascinating. Here in the PNW we don't typically see balloon framing, but even so the dry-in time is still really quick. A two-story house can be framed up and have roof sheathing on in a week or so, and in another week have the roof and tyvek on. Even if the entire process was done in a downpour it still doesn't take long after that before it's dry enough to start interior work.