Re:Four ways to speed up trains on the New Silk Road (2020)
by AnimalMuppet on Monday April 05, 2021 @03:37PM
(#26703593)
Siding length isn't an issue if the line is double-tracked the whole way.
[ Parent
| on HN ]
Re:Four ways to speed up trains on the New Silk Road (2020)
by Animats on Monday April 05, 2021 @04:01PM
(#26703886)
If there are any problems, lack of a siding somewhere nearby leaves the main line blocked. Also, at the destination, you need some place to put the thing, except for bulk mine trains which go round and round a loop.
Re:Four ways to speed up trains on the New Silk Road (2020)
by AnimalMuppet on Monday April 05, 2021 @04:30PM
(#26704268)
On a double-tracked line, lack of a siding somewhere nearby leaves one of the two main lines blocked. That's still serious, but less than what you are saying.