News for hackers. Stuff that matters.
Re:Fusion startup plans reactor with small but powerful supe... by Fordec on Friday March 05, 2021 @02:50PM (#26361230)
Wasn't ITER supposed to be built by now? DEMO was supposed to start in 2033 as the successor to ITER.
Re:Fusion startup plans reactor with small but powerful supe... by cygx on Friday March 05, 2021 @03:50PM (#26361906)
If you try to coordinate design and manufacturing among 35 participating states, delays tend to happen.

Perhaps also noteworthy from a historical perspective is that the whole thing was proposed by the Soviet Union, which doesn't even exist anymore. The US also pulled out of the collaboration in '98, necessitating a redesign; they rejoined in 2003, but congress periodically tries to pull the plug...

Re:Fusion startup plans reactor with small but powerful supe... by Veedrac on Friday March 05, 2021 @03:20PM (#26361542)
ITER, like many oversized government programs where funding and structure are almost entirely political, has had delays. First plasma (not full power) was originally scheduled for 2016, and is now 2025.
Re:Fusion startup plans reactor with small but powerful supe... by gary_0 on Friday March 05, 2021 @04:31PM (#26362384)
See also: The SLS program (the "Senate Launch System").
Re:Fusion startup plans reactor with small but powerful supe... by willis936 on Friday March 05, 2021 @02:54PM (#26361267)
It depends on which baseline you're referring to and how many more times the US would back out of its financial commitment after that baseline was made.