Re:Fusion startup plans reactor with small but powerful supe...
by Fordec on Friday March 05, 2021 @02:50PM
(#26361230)
Wasn't ITER supposed to be built by now? DEMO was supposed to start in 2033 as the successor to ITER.
[ Parent
| on HN ]
Re:Fusion startup plans reactor with small but powerful supe...
by cygx on Friday March 05, 2021 @03:50PM
(#26361906)
If you try to coordinate design and manufacturing among 35 participating states, delays tend to happen.
Perhaps also noteworthy from a historical perspective is that the whole thing was proposed by the Soviet Union, which doesn't even exist anymore. The US also pulled out of the collaboration in '98, necessitating a redesign; they rejoined in 2003, but congress periodically tries to pull the plug...
Re:Fusion startup plans reactor with small but powerful supe...
by Veedrac on Friday March 05, 2021 @03:20PM
(#26361542)
ITER, like many oversized government programs where funding and structure are almost entirely political, has had delays. First plasma (not full power) was originally scheduled for 2016, and is now 2025.