What do you mean by bad planning. Are you talking about planning that is flexible and responsive to pick up the slack. For example, a high demand day that is cloudy and not windy?
[ Parent
| on HN ]
Re:Europe: close to power grid blackout (49,74Hz power line ...
by MayeulC on Saturday January 09, 2021 @09:16AM
(#25700536)
I am talking about designing a grid to be robust, and has enough spare capacity to handle difficulties without failing catastrophically.
For critical infrastructure, you design for worst-case scenarios, inflate the safety margins, and make backup plans (like a plan to gracefully degrade service).
Failing this and cutting corners is what I would call bad planning.