This usually works without any issues, but on one type of projector they had used a non-shielded network cable internally in the projector and if the projector lamp was lit juuuust at the right moment, the handshake would fail and the film would not play. Normally it wouldn't be a huge deal as the handshake happens just before the film and the lamp is usually lit on the beginning of the show long before the film starts. HOWEVER, there was this one cinema chain that had standardized their playlists in such a way that they for some stupid reason turned of the projector lamp in between the trailers and the film (I think to "introduce" the film) and then turned it on again just before the film with the result that the handshake failed 3 out of 10 times or so.
Long term solution was to replace the shoddy cable. Short term solution was to change all their playlist templates to blind the lamp instead of turning it off. Like they should have done to begin with.
Sure, they buy materials wholesale, but they bill you full retail for it. I installed around a mile of wiring :-)
But I also got it exactly the way I wanted, the wires run where I wanted, and I bought professional quality tools to do the work, and still have/use them. I like working with my hands now and then, it's viscerally satisfying in a way a keyboard never is.
The typical electrician gets it indeed for cheaper than market rate, then charges it to you retail rate plus 20% to account for the "trouble" of sourcing and purchasing it.
I never claimed that.
The typical electrician
Maybe you rather mean 'the typical electrician I met' or so because I know for a fact the rest of that sentence does not apply to the ones I met myself.
I know that twisted pair is supposed to be resistant to that, but I wasn't going to risk it and didn't have a good way to test it. I didn't want even a teensy bit of hum, and there isn't any :-)
If an electrician had done it, it likely would have been 10 or 20x more.
Hmm, that is like twice the amount one would typcially pay here. Still, don't froget the working hours you put in there :) plus the fact that usually technicians get their materials for cheaper than you do (also because in my case it's only 6% VAT instead of 21%). I did many such calculations when renovating and for some things it was actually cheaper to get a technician.