This is where hydro-based power plants excel, they're able to adjust the power output as quickly as gravity can push the water down the pipes. They're able to ramp up from almost no output to full capacity in minutes. Gas-turbines are also able to do this.
But it's well worth reading https://www.ofgem.gov.uk/system/files/docs/2019/09/eso_techn... on an actual UK grid trip event to see what kind of things can happen; start at "summary of event" on p4. Note the three paragraphs starting with "However" as subsequent stability systems also failed.
> This made the cumulative loss of generation 1,691MW
(!)
> All of the available “backup” power had already been deployed
Which in turn means if anything else goes wrong with the grid and there isn't enough generation, then all home solar countrywide cuts out, making the problem 10x worse.
Lesson learned: "I detected something weird, lets turn off" is not a good algorithm for everyone to use on a system requiring high uptime!
It was obvious from the start really...
"On December 14, the Loy Yang coal power plant — one of the largest in Australia — suddenly went offline. In an instant, the grid shed 560 MW of electricity, enough to power 170,000 homes. 600 miles away, the Hornsdale Power Reserve battery system, as the Tesla system is officially known, kicked in within 140 milliseconds. It reacted so quickly, in fact, that the local grid operator was unable to measure the response time accurately. "
https://cleantechnica.com/2017/12/27/tesla-grid-storage-batt...