> That is if A and B seem to depend on each other you have some sub tasks in each that need to be pulled out.
That produces subtasks without cycles, giving you a way forward.
Assuming you still want to maintain shared information about the tasks which contain subtasks, those tasks still have a dependency cycle between them though, which is correct because tasks are often like that - they need to move forward together.
Re:Openproject: Open-source project management software
by projektfu on Monday October 19, 2020 @11:20PM
(#24833647)
I assume a decent plan willbe hard to make without understanding that a sizeable portion will have to be reworked. (In software at least). For example, the Boehm model. How do you make a Gantt chart without abstracting away the whole project?
Another thing to keep in mind is that there's a distinction between a system having cyclic dependencies (I need A & B working because they communicate with each other), and the task ordering. During development you can end up with a partially correct system. If A sends to B, and B sends to A but I only have one person working on both parts, then it's possible I'll end up in a state where A sends to B but not the reverse. That's fine during development. Yes, the system is "wrong" per the design or spec. But it's a partial system (like a half-built bridge). Your tasks will appear to have a cycle, but in reality you will break it by selecting one portion to complete first so in the end it remains (based on the chosen path) a DAG.