Re:Nuclear power: Are we too anxious about the risks of radi... by numpad0 on Monday September 28, 2020 @05:37AM (#24614785)
Virginia-class nuclear submarine(GE "S9G" PWR using HEU cores, 210 MWth) takes as little as 1-2 year from laydown to launching. 19 such hulls is in service, 11 in construction.
Re:Nuclear power: Are we too anxious about the risks of radi... by m4rtink on Monday September 28, 2020 @10:28AM (#24616947)
Thats still pretty small and usage specific - modern 1000 MW electricity producing nuclear power plants produce about 3000 MW of heat, so about 15x the naval nuclear reactor in your example.
Re:Nuclear power: Are we too anxious about the risks of radi... by numpad0 on Monday September 28, 2020 @10:36AM (#24617048)
Like I said, US had commissioned around 20 of those reactors in the past couple decades.
Re:Nuclear power: Are we too anxious about the risks of radi... by m4rtink on Monday September 28, 2020 @07:14PM (#24622268)
Fair enough - still what I'm trying to say is that those 20 cover the thermal output of a single modern reactor & many are needed even just to get rid of seriously polluting power sources, like the brown coal/lignite fired power plants used in many places in Europe.
Re:Nuclear power: Are we too anxious about the risks of radi... by fulafel on Tuesday September 29, 2020 @02:32PM (#24631312)
How is the cost per MWh in construction and ops?