I don't think a bump in salaries that puts a country in the same ballpark as existing manufacturing locations( not counting the extra costs of manufacturing in the States or in Europe) is going to be such a big push for more automation. After a certain point the versatility of human workers is still useful.
> "The Standish Group started with a traditional metrics of success by looking at: “on time, on budget, and on target”. This means in this CHAOS Report 2018 for the year 2017: successful: 36%, challenged: 45%, failed: 19%. If they use their “modern” definition of success: “on time, on budget, with a satisfactory result.” You get almost the same results (33%, 48%, 19%)."
So, about 1/3 of IT projects are successful, including being on-time and on budget, and about 1/5 are total losses that fail to deliver any value at all. Not great odds and I'd expect the numbers are likely to be broadly similar in other engineering fields.
The decision on whether or not to embark on an engineering project (and whether to do it in-house or hire a third party) is among the most challenging duties executives have.