Re:Radical hydrogen-boron reactor leapfrogs current nuclear ...
by ChuckMcM on Friday February 21, 2020 @02:43PM
(#22386089)
Spot on analysis. There is one loophole which is Total Cost of Ownership (TCO).
If you energy production solution can achieve a lower TCO in an existing market segment, steps six and seven (production and supply chain) take care of themselves. The poster child for this was 'on premise PV generation.'
Once a nuclear technology demonstrates a lower TCO for baseline power generation, its game on.
If you energy production solution can achieve a lower TCO in an existing market segment, steps six and seven (production and supply chain) take care of themselves. The poster child for this was 'on premise PV generation.'
Once a nuclear technology demonstrates a lower TCO for baseline power generation, its game on.