The pricing methodology is all over the map. A new problem is the practice of free level 2 charging and charging money for fast chargers. The fast chargers sit idle and the free L2 chargers are all in use. Personally, I would pay, but my car only supports L1&L2.
Some combination of the two (time and energy) is ideal to prevent station hogging, though.
When we're talking about energy, the units are kWh (i.e. kW * h), not kW/h. Watts/kilowatts are already defined as unit energy per unit time. In the case of watts, we're talking Joules (energy) per second. kWh is thus 1000 joules / second for 1 hour (3600 seconds), or 1000 * 3600 = 3 600 000 joules (3.6 MJ).
kW/h exists, it just means something different - a rate of acceleration of changing energy (joules / s / s).
> Some combination of the two (time and energy) is ideal to prevent station hogging, though.
That's a good point; in the extreme you wouldn't want someone sitting there trickle charging for ages when already charged.
If it were up to me it'd be tiered like:
t <=30min: £V / kWh
30m < t <= 2h: £W / kWh
2h < t <= 4h: £X / kWh
4h < t <= 8h: £Y / kWh
t >= 8h: £Z / kWh
where V < W < X < Y < Z, and probably per daily billing period rather than per charge, to avoid cheating it by unplugging and re-plugging if you were nearby at work or a motorway service station say.
Petro-Canada has a trans-Canada CCS charging network already: https://www.petro-canada.ca/en/personal/fuel/ev-fast-charge-...
Electrify Canada is working on it: https://www.electrify-canada.ca/locate-charger