News for hackers. Stuff that matters.
Re:Caltrain Vibration and Volatility Analysis by Symbiote on Friday January 17, 2020 @03:59AM (#22073059)
Twice a year?!

It's not just Japan. France and Britain check their tracks every 2 weeks.

The British high speed measurement train has a site with pictures of some sensors, statistics ("captures around 10TB of image data every 440 miles") and a video showing more sensors, and an on-train server room.

https://www.networkrail.co.uk/running-the-railway/looking-af...

Re:Caltrain Vibration and Volatility Analysis by goodcanadian on Friday January 17, 2020 @04:28AM (#22073199)
From your link:

-The train surveys 4,800 miles of track every two weeks.

-The train covers 115,000 miles in a year.

It does not cover the entire system every two weeks.

EDIT: Wikipedia suggests a little over 10,000 miles of track in the UK, so it might be going over it all once a month though I suspect that heavily used high speed lines are covered more frequently than less used lines (which are more comparable to Caltrain).

Re:Caltrain Vibration and Volatility Analysis by teh_klev on Friday January 17, 2020 @05:12AM (#22073426)
There are multiple inspection trains, not all of them need to be high speed. The well known "flying banana" is used to cover high speed lines, but for lines with lower top speeds there's also a fleet of loco hauled measurement and inspection trains that cover low speed and branch lines.
Re:Caltrain Vibration and Volatility Analysis by Symbiote on Friday January 17, 2020 @06:00AM (#22073642)
This article says the other trains cover routes monthly.

https://rail-record.co.uk/guide-to-network-rail-test-trains/

Re:Caltrain Vibration and Volatility Analysis by teh_klev on Friday January 17, 2020 @05:17PM (#22080082)
That's a decent article thanks for posting.
Re:Caltrain Vibration and Volatility Analysis by dsfyu404ed on Friday January 17, 2020 @08:36AM (#22074470)
Considering the other problems Caltrian has to deal with not spending much time checking rail straightness above and beyond what's required for the trains to operate seems like a very reasonable allocation of resources.
Re:Caltrain Vibration and Volatility Analysis by willyt on Friday January 17, 2020 @12:01PM (#22076485)
I think the french do a better job though, the TGV is way smoother than Virgin Trains despite travelling at about twice the average speed. You could do a hand drawn sketch on a TGV, you can't do this on a UK train.
Re:Caltrain Vibration and Volatility Analysis by laurencerowe on Friday January 17, 2020 @12:49PM (#22077130)
I think this is due to the track being much curvier. Virgin’s trains have to tilt so they can run fast on standard lines. Dedicated high speed lines are built much straighter.
Re:Caltrain Vibration and Volatility Analysis by inferiorhuman on Friday January 17, 2020 @01:25PM (#22077528)
As someone who got stuck in between towns for about an hour while the conductor blamed passengers for the problem – UK rail is mediocre, to put it mildly. The engineer was a bit more constructive and spent his time on the phone with Hitachi. The London Underground is about the only exception here.

Meanwhile tilting trains are designed to tilt so that they can run at faster speeds. They can be designed to ride just fine (e.g. Shinkansen, Amtrak's Acela Express, some of RENFE's AVE lines, etc).

Re:Caltrain Vibration and Volatility Analysis by laurencerowe on Friday January 17, 2020 @01:58PM (#22077910)
Moving to California gave me a new appreciation for UK rail.
Re:Caltrain Vibration and Volatility Analysis by inferiorhuman on Friday January 17, 2020 @09:02PM (#22081669)
Most of California's rail is low speed and diesel powered. There's almost certainly a higher density of rail service in England, but electrified and/or high speed rail is fairly rare. The infrastructure was so poor around the reign of Thatcher that a lot of the notorious British innovation went into high speed service on low quality tracks.

It's all quite unfortunate as the Brits really had a chance to build out an amazing system (something California hasn't really had the interest in doing). The Underground is pretty great, DLR is at least as dirty and disgusting as BART, and the regional stuff… they don't call it Worst Western Railway for nothing. Electrification is coming at a snail's pace both to California and the UK.

Re:Caltrain Vibration and Volatility Analysis by inferiorhuman on Friday January 17, 2020 @04:01AM (#22073071)
Well Caltrain doesn't have the wrong kind of snow to contend with.

Edit: In case the snow reference went over anyone's head: https://en.wikipedia.org/wiki/The_wrong_type_of_snow