Every story and comment from the Hacker News API, in a layout borrowed from 2001.
A comment on It took 12 weeks to ship an MVP I thought would take 3. Parent comment
We also work with a Kanban-like methodology. Basically a pull system with a hard limit on WIP.
There are no comments on this comment yet.
We also work with a Kanban-like methodology. Basically a pull system with a hard limit on WIP.