Further information: this particular project (Tees CCPP) is actually a replacement for a former CCGT that was on the same site.
"Historically the Site accommodated a 1,875 MW Combined Cycle Gas Turbine power station (the former Teesside Power Station) with the ability to generate steam for utilisation within the wider Wilton International site. The Teesside Power Station ceased generation in 2013 and was demolished between 2013 and 2015."
"Historically the Site accommodated a 1,875 MW Combined Cycle Gas Turbine power station (the former Teesside Power Station) with the ability to generate steam for utilisation within the wider Wilton International site. The Teesside Power Station ceased generation in 2013 and was demolished between 2013 and 2015."
https://en.wikipedia.org/wiki/Teesside_power_station
https://www.tccpp.co.uk/pdfs/changeConsultationDocuments/NMC...