Re:All the best engineering advice I stole from non-technica...
by Aeolun on Monday August 05, 2019 @05:30AM
(#20612623)
The problem is not the tracking. It is your boss coming over after 3 days asking why this 1 day task is suddenly taking 3 times as long, and how much longer do you think it will take?
Never mind that the task spec changed 5 times in those 3 days.
Never mind that the task spec changed 5 times in those 3 days.