Re:Escape the scripter mentality if reliability matters (2011)
by andrewflnr on Saturday July 27, 2019 @03:36PM
(#20543711)
Sure, but maybe the assistant gets distracted by other work, or gets sick and don't get a chance to make sure someone else does it, or quits because their boss is a jerk, or any number of other things going wrong. At least a few of these will happen over the course of two years.
But in the general case you’re absolutely right: any analysis like this should include the costs and probability of faults occurring in each option.