Re:Carbon emissions and costs of subsidizing New York nuclea... by toomuchtodo on Saturday January 19, 2019 @09:22PM (#18950541)
> In other words, if they abruptly terminated use of all the aging nuclear plants today, and immediately started building totally new, highly modern nuclear power facilities, how would that stack up against this research favoring renewables?

Probably not well.

https://www.technologyreview.com/s/612564/chinas-losing-its-... (China’s losing its taste for nuclear power. That’s bad news.)

https://www.theguardian.com/business/2019/jan/17/hitachi-set... (Hitachi scraps £16bn nuclear power station in Wales)

https://www.nytimes.com/2017/07/31/climate/nuclear-power-pro... (U.S. Nuclear Comeback Stalls as Two Reactors Are Abandoned)

https://www.independent.co.uk/voices/hinkley-point-managemen... (Hinkley Point management is the perfect illustration of how not to conduct a modern energy policy)

https://www.tampabay.com/news/business/energy/trigaux-abando... (Trigaux: Abandoning another nuclear project, Duke Energy mimics its failed Levy plant)

https://www.wfae.org/post/duke-cancels-florida-nuclear-proje... (Duke Cancels Florida Nuclear Project, Plans Solar Expansion)

Shutting existing nuclear without ramping renewables would be catastrophic. Best case scenario is extending their operating licenses 10-15 years in the future until generation capacity has been replaced. It only takes about a year to replace the generating capacity (including capacity factor) of a nuclear generator (which takes ~10 years to build) with renewables.

In the US, there are 65 pressurized water reactors (PWRs) with a combined capacity of about 65 GWe and 33 boiling water reactors (BWRs) with a combined capacity of about 34 GWe – for a total capacity of 99,221 MWe. ~50% more than this amount of generating capacity is coming online as utility scale solar over the next five years in the US. Five years! Replace the entire nuclear fleet with replacement nuclear in five years? Never.

https://pv-magazine-usa.com/2019/01/01/solar-tsunami/ (Developers have applied to build 139 GWac of large-scale solar projects in the territory of six grid operators – around five times what is currently online across the country – and that figure doesn’t even cover the entire United States. By any metric, we are looking at an unprecedented boom in solar development over the next five years.)

To really get a good idea why this is the case, check out the maps on the right side of https://www.eia.gov/electricity/monthly/#tabs_unit-4, and compare the maps between generating units coming online in the next 12 months to the map of generating unit retirements in the next 12 months. All new generation is solar, wind, and natural gas. All retired generation is primarily coal or nuclear.

To be blunt, no further commercial nuclear generation will be built. Maybe we subsidize renewables more? That'd be swank.

Re:Carbon emissions and costs of subsidizing New York nuclea... by regnuables on Saturday January 19, 2019 @10:33PM (#18950823)
That didn’t really answer the question. It was just a blanket statement that it’d be a bad idea.

The links all just point to trends. The inventory just says the way things are. And then a map of actual plans? Who asked about actual plans?

That wasn’t the question at hand. The fundamental question at hand was the difference between old versus new nuclear technology, whether or not whatever the actual plans are.

But yeah, just drop links and say no. Really great. Top notch discussion.

Re:Carbon emissions and costs of subsidizing New York nuclea... by toomuchtodo on Saturday January 19, 2019 @10:36PM (#18950834)
Several of the links I posted explain that new reactor designs were used, and that estimated cost overruns exceeded almost $15 billion in some cases (South Carolina). Can you be more specific about what evidence you're looking for that nuclear, built today, isn't cost effective besides the various citations I've provided? I've provided more information below, and if that isn't sufficient, feel free to email me with additional questions. The TLDR is "Nuclear kept getting more expensive, renewables plummeted in price, and the growth of energy demand in first world countries plateaued".

From the Union of Concerned Scientists:

https://www.ucsusa.org/nuclear-power/cost-nuclear-power

> The first generation of nuclear power plants proved so costly to build that half of them were abandoned during construction. Those that were completed saw huge cost overruns, which were passed on to utility customers in the form of rate increases. By 1985, Forbes had labeled U.S. nuclear power "the largest managerial disaster in business history.”

> The industry has failed to prove that things will be different this time around: soaring, uncertain costs continue to plague nuclear power in the 21st century. Between 2002 and 2008, for example, cost estimates for new nuclear plant construction rose from between $2 billion and $4 billion per unit to $9 billion per unit, according to a 2009 UCS report, while experience with new construction in Europe has seen costs continue to soar.

Feel free to read the entire blog post to understand exactly why nuclear is so expensive it can't be built. There is also a link to a report the UCS published in 2009 and a financial analysis published in 2011 that goes into great detail.

Re:Carbon emissions and costs of subsidizing New York nuclea... by pjc50 on Sunday January 20, 2019 @06:34AM (#18952558)
> Who asked about actual plans?

It's no use saying it would be great in theory if it turns out not to work or be cost effective in practice. This problem dogs a lot of technologies but nuclear has a particularly bad case of making promises that it doesn't meet in practice.

Re:Carbon emissions and costs of subsidizing New York nuclea... by Iwan-Zotow on Saturday January 19, 2019 @10:31PM (#18950810)
> Duke Cancels Florida Nuclear Project, Plans Solar Expansion

And what Floridians are going yo do at night? Fornicate?