News for hackers. Stuff that matters.
Re:Full Shutdown of L Train to Be Halted by Cuomo by a-dub on Thursday January 03, 2019 @04:34PM (#18819508)
I wonder what the loss of space on one side will mean operationally. I often see people on both sides when they're doing work.

Also tickled me that they're just going to leave the existing cabling in place. It's like physical tech debt.

The whole thing did somewhat come across like a hacky patch though. Although I do have to wonder how feasible it would have actually been to remove all the benchwall (which is attached to the inner lining) without damaging the inner lining.

That said, if the hack works long enough to keep it up until all those AmazonBux buy a new crossriver tunnel, then good on 'em!

Re:Full Shutdown of L Train to Be Halted by Cuomo by ergothus on Thursday January 03, 2019 @04:57PM (#18819703)
Hacky patch through or in-place incremental refactoring? (Honest question, my knowledge of the subway in general and this plan in particular are limited to the comments here)