It's some kind of hanging cable system.
Here's how cabling is done in some parts of the London Underground system: https://www.alamy.com/stock-photo-cables-on-a-station-wall-o...Also tickled me that they're just going to leave the existing cabling in place. It's like physical tech debt.
The whole thing did somewhat come across like a hacky patch though. Although I do have to wonder how feasible it would have actually been to remove all the benchwall (which is attached to the inner lining) without damaging the inner lining.
That said, if the hack works long enough to keep it up until all those AmazonBux buy a new crossriver tunnel, then good on 'em!
This is true. (Along with everything else you posted.) At the same time though, all of this will mean less money for contractors. I have no problem with that, just wondering how much resistance this thing will meet? Because I know a lot of entities out there were banking on making a lot of money off of MTA lines in the near future.
The better engineering is certainly a plus, but the time to have brought this up would've been two years ago when they started talking about all this in the first place. Cuomo has been the governor for a better part of a decade, this reeks of political oppurtunism.
The governor shouldn't have had to get involved at all, but I think it's good that he did. I wonder about the planning process that made it necessary. Something was screwed up there.
If this is opportunism, more of that, please, rather than letting bad plans go through.
The governor pushing the MTA to complete the Second Avenue Subway on time: https://www.nytimes.com/2016/12/13/nyregion/second-ave-subwa...
The subway was then found not to have completed safety testing in the sake of opening "on time": https://www.nytimes.com/2017/09/20/nyregion/second-avenue-su...
The governor lambasting fare hikes that are largely the result of his administration underfunding the agency, and blaming it on "waste" by his own administrators: https://www.nydailynews.com/news/politics/ny-pol-cuomo-mta-f...
In fact, this most recent thing happened after he decided to interrupt subway service in this tunnel for a photo op two weeks ago, despite the fact that his agency has known about it for almost three years now. http://bedfordandbowery.com/2018/12/watch-gov-cuomo-sample-t...
Public infrastructure projects in general seem to have above market costs and NYC is sort of notorious for problems in this area. (e.g. https://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&c...)
It's a corporation distinct from the state government but the governor still influences major decisions, whereas the local government doesn't have any direct control.
The old plan called for replacing all of the bench walls along the length of both tunnels. Bench walls are the short concrete casements which house the cables needed to power the train and provide communications. Replacing them was necessary because of leakage to the cables which corrodes them. It would have been a total gut removal.
The new plan is to 'rack' the cables along the walls, which will improve access and be way cheaper. It's some kind of hanging cable system. Some of the bench walls are damaged, so they will be removed or patched on an as needed basis. Otherwise they are obsolete, so the important bit is that they don't fall onto the tracks. There will be sensors to monitor for problems with the remaining benchwall.
These techniques have been used in new tunnel construction outside the US, but never to rehabilitate an existing tunnel. It seems like a much needed improvement over the old plan which will have less costs and inconvenience.