Re:Sydney Opal Tower: Thousands evacuated after 'crack'
by djmips on Tuesday December 25, 2018 @03:58AM
(#18756645)
In your wiki link it says the tear down was expected to cost $11.5 million which must be much lower than construction costs. (quick search says $275 million to build) In general it only makes sense that demolition is much cheaper than construction.
At least they caught it before it was fully constructed, but it still cost almost as much to tear it down as it did to build!