My father was the volunteer emergency service coordinator (and power station operator) in the tiny town where we grew up. his use of road names + power poles ids + direction & distance was frequently complimented by the accident investigators when they came to look at shit (and later the court cases for some)
Remote areas with 10s of KMs of power line and 0 other features :|
I could talk about this subject for hours so let me know if you have any other questions.
:)
You can read a bit more about the calculations here[0]
[0] https://yorkcentraltechtalk.wordpress.com/2012/06/27/transfo...
Edit: noted that 200kVA is the maximum rating, not default rating.
There is a science and an art to sizing residential xfmrs. Generally is depends on the square footage, number of bedrooms and type of fuel used to condition the house.
Probably where GP is running into problem(like most electrical utilities) is that the use of electricity per square foot keeps going up.(caused by the increase of electrical devices in the home) So while the xfmr might have been sized correctly when installed 20-40 years ago, it is no longer sufficient. This causes problems.
Source: I was a distribution engineer for 7 years.
But I never thought about pole xformer sizing until this house. Our 35kVA (summer) faceplate xformer services nine homes. Even though it browns, it keeps on working. They've got a lot of margin, it seems
To elaborate on a few of the statements from the post
The sequential ordering of pole numbers is definitely planned, and fits in with a scheme developed back in the 60s-70s which made documenting the poles lifecycle in paper records much easier. The poles are numbered sequentially with prefix numbers generally indicating which substation district the pole belongs within. Distribution utilities think about their infrastructure as a network of substation circuits. You should be able to tell which circuit you are on based on the numbering on the pole. Not all distribution systems use three phases, some use two, some use single. It all depends on where you are in the system and the general layout of the circuits within the distribution network. Also not all distribution is 7kV, some are 12kV, and some are 25kV. Again this all changes based on the properties of the system, and the qualities that are being optimized for by the power engineers. This can be done a number of different ways, but one of the common ways is with a laser engraver. This is a fairly recent practice, so I am not as versed in the operational details as with traditional tagging. Another means of tagging which is not covered in the article is carving the numbers into the pole with a physical etcher, similar to a wood router. OSMOSE was at the time of my work in this field, the largest such company that dealt in the support and maintenance of residential utility poles. They have some very interesting proprietary mechanisms for managing inventories, and are generally a very smart group of people. My guess is that they collect all the inventory and survey maintenance of poles using mobile LiDAR and machine vision now, as that was what we were speaking to them about at the time.