Re:California bullet train cost surges by $2.8B
by dx034 on Thursday January 18, 2018 @03:13AM
(#16175503)
The track can be used for 1-2 centuries (as they have been in Europe). That includes many refurbishments and replacement of steel but much of the construction cost will be low per passenger.
[ Parent
| on HN ]
Re:California bullet train cost surges by $2.8B
by baud147258 on Thursday January 18, 2018 @05:39AM
(#16176069)
Older tracks can't be used for high speed trains. In France, all the new high-speed lines are constructed for this usage (lot of straight lines). On older lines, an high-speed train will be at the same speed as a normal commuter train.